IWS MaxiJet NJ 3000 Long lead Pump

  • Sale
  • Regular price £80.00


The Newa-Jet Submersible Pump range deliver large amounts of liquid every hour, and give you that efficiency coupled with being maintenance free and very quiet. You can adjust the liquid flow, whether water or nutrients or a combination of both, and you get high performance but with low power consumption.


The Pumps can be used submerged but also externally as they are supplied with an adapter that allows the connection of pipe to the inlet. Its protected motor will not overheat and you can use the rotary inlet to regulate liquid flow rate. This Pump gives you control over how much liquid you want to put into your system with options for increasing your growing areas.


The NJ3000 IWS Pro Fill has a 2-pin plug that connects to the IWS brain to take power when the feed timer activates.